Use home air flow ultrafine pulverizer to prepare the work before starting

2022-01-21 16:31:21
times

Small crusher is no longer the laboratory and major Chinese medicine stores exclusive machinery, now some small crusher can not only be used in enterprises and engineering, their small family can also eat such crusher, why some small crusher for home use? Household small crusher is small and beautiful, the weight is also very light, unlike some professional crusher needs to be fixed in the same place, household crusher function arbitrary movement, operation is not only simple, the main is no noise, power consumption is not very large, this type of crusher is suitable for use at home. Because it is a crusher used at home, so some professional knowledge may not understand, especially before the preparation, but also to do a good job, do not do a good job of preparation, in the process of operation is likely to occur some glitches and delay time.


(1) The grinder should be fixed on the cement foundation. If the working place is frequently changed, the crusher and motor shall be mounted on a pedestal made of Angle steel.


(2) After the installation of the crusher, check the tightness of all parts, and check whether the tightness of the transmission belt is appropriate, and whether the motor shaft and the crusher shaft are parallel.


(3) Before the crusher starts, rotate the rotor by hand to check whether the operation is flexible and normal, whether there is collision in the casing, whether the rotation direction of the rotor is correct, whether the lubrication of the motor and the crusher is good, etc.


(4) After the mill starts, it should idle for 2-3 minutes first, and then feed the material when there is no abnormality.


(5) Carefully check the material, so as to avoid metal, stone and other hard objects into the crushing chamber to cause accidents.


(6) Feeding should be uniform. If there is noise, high temperature of bearing and body or spraying material, stop the machine immediately for inspection and troubleshooting.


(7) When feeding, the staff should stand on the side of the crusher to prevent the debris from bouncing out of the face. Do not hold the long stalks too tightly to prevent them from being carried in.


(8) Do not replace the belt wheel casually, in case the speed is too high or too low.


(9) Stop feeding before stopping the machine, and cut off the power supply to stop the machine after cleaning the materials in the standby machine. Cleaning and maintenance should be carried out after the shutdown.


(10) After 300 hours of operation, the bearing must be cleaned and the oil replaced; When installing oil, it is better to fill 1/3 of the gap of the bearing seat, and Z shall not exceed 1/2. When the machine stops for a long time, the transmission belt should be removed.


I think the above ten there must be their own attention, so in the use of family small grinder, must be ready to work.


Tags

Recently Viewed:

Contact us

Shanghai Huasan Powder Equipment Co., LTD

Contact person: Manager Zhu

Tel: 021-57460338/57460358/57468812

Mobile phone: 13818804871/18017628352

Fax: 021-57463615

Email:sales@huasanpowder.com

Address: No.33 puzhuang Road, Zhuanghang European Industrial Park, Fengxian District, Shanghai